A Stakeholder Analysis of the KLIA2 Airport Terminal Project

Authors

  • Nor Azlina Mohd Isa Arshad Ayub Graduate Business School, Universiti Teknologi MARA, Malaysia ARA

DOI:

https://doi.org/10.21834/ajbes.v3i13.138

Keywords:

stakeholder theory, airport stakeholders, airport terminal, project management.

Abstract

Managing an airport terminal project is complex due to the involvement of a large number of stakeholders. Airport stakeholders include many organisations and individuals, making it a collaborative service environment. Stakeholder theory denotes that organisation should strive to create value for all its stakeholders without the need to trade off. This study attempted to provide an overview of the literature relating to the stakeholder theory as well as examining the related respondents towards measuring the collective perspectives of the klia2 airport terminal project. 

Keywords: stakeholder theory; airport stakeholders; airport terminal; project management.

eISSN 2398-4295 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. 

DOI: http://dx.doi.org/10.21834/ajbes.v3i13.138

References

AG to audit klia2. (2015, May 23). New Straits Times (Malaysia)

Argandoña, A. (2011). Stakeholder theory and value creation, Working Paper, WP-922.

Bezerra, G.C.L. & Gomes, C.F. (2015). The effects of service quality dimensions and passengers characteristics on passenger’s overall satisfaction with an airport. Journal of Air Transport Management, 44 – 45, 77 – 81.

Bogicevic, V., Yang, W., Bilgihan, A. & Bujisic, M. (2013), Airport service quality drivers of passenger satisfaction. Tourism Review, 68(4), 3 – 18.

Dohnalová, Z., & Zimola, B. (2014). Corporate Stakeholder Management. Procedia - Social and Behavioral Sciences, 110, 879–886.

Fageha, M. K., & Aibinu, A. a. (2013). Managing Project Scope Definition to Improve Stakeholders’ Participation and Enhance Project Outcome. Procedia - Social and Behavioral Sciences, 74, 154–164.

Finch, P. (2003). Applying Slevin-Pinto Project Implementation Profile to an Information Systems Project. Project Management Journal, 34(3), 32-39.

Fitrijanti, T. (2015). Index of the Company’s Stakeholders Welfare. Procedia - Social and Behavioral Sciences, 211(September), 1023–1027.

Freeman, R.E, Harrison, J.S., Wicks, A.C, Parmar, B. & Simone de Colle. (2010). Stakeholder Theory: The State of the Art. New York. Cambridge University Press.

Freeman, R.E (1984). Strategic Management: A Stakeholder Approach. Boston. Pitman Publishing Inc.

Harrison, A., Popovic, V., Kraal, B. J., & Kleinschmidt, T. (2012). Challenges in passenger terminal design : A conceptual model of passenger experience. Proceedings of the Design Research Society, 344–356.

Hussein, H., & Yaacob, N. M. (2013). Malaysian perspective on the development of accessible design, Asian Journal of Environment-Behaviour Studies, 4(12), 101–116.

Project Management Institute. (2013). A guide to project management body of knowledge (PMBOK guide). Newton Square, Pa: Project Management Institute

Rosacker, K. M., Zuckweiler, K. M., & Buelow, J. R. (2010). An empirical evaluation of hospital project implementation success. Academy of Health Care Management Journal VO - 6, 6(1), 37.

Schaar, D. & Sherry. L. (2010). Analysis of Airport Stakeholders, Integrated Communications Navigation and Surveillance Conference (ICNS), J4 1-17.

Sözüer, M., & Spang, K. (2014). The Importance of Project Management in the Planning Process of Transport Infrastructure Projects in Germany. Procedia - Social and Behavioral Sciences, 119(0), 601–610.

Stieb, J. A. (2009). Assessing Freeman’s stakeholder theory. Journal of Business Ethics. 87, 401–414.

Toor, S.-R. & Ogunlana, S. O. (2009). Construction professionals’ perception of critical success factors for large-scale construction projects. Construction Innovation: Information, Process, Management, 9(2), 149–167.

Turner, R. & Zolin, R. (2012). Forecasting success on large projects: developing reliable scales to predict multiple perspectives by multiple stakeholders over multiple time frames, Project Management Journal, 43(5), 87 – 99.

Yang R.J. & Shen, G.Q.P. (2014). Framework for stakeholder management in construction projects. Journal of Management in Engineering, 31(4), 1-14.

Downloads

Published

2018-08-25

How to Cite

Mohd Isa, N. A. (2018). A Stakeholder Analysis of the KLIA2 Airport Terminal Project. Asian Journal of Behavioural Studies, 3(13), 1–7. https://doi.org/10.21834/ajbes.v3i13.138

Issue

Section

Articles