Economic Attributes related to Industrialised Building System in Malaysia

Authors

  • Siti Mazzuana Shamsuddin Faculty of Civil Engineering, Universiti Teknologi Malaysia, Skudai 81310, Malaysia
  • Rozana Zakaria Faculty of Civil Engineering, Universiti Teknologi Malaysia, Skudai 81310, Malaysia
  • Sarajul Fikri Mohamed Faculty of Built Environment Universiti Teknologi Malaysia, Skudai 81310, Malaysia

DOI:

https://doi.org/10.21834/ajbes.v3i11.102

Keywords:

Industrialised Building System (IBS), sustainability, attributes

Abstract

This paper aimed to determine the economic attributes related to the sustainability of Malaysian construction. The method for data collection is questionnaire survey, which collected from 50 respondents. The results showed that there are many momentous economical attributes identified, which are IBS offers long-term monitoring mechanism by using Life Cycle Costing in cost development, the thoughts of environmental-related products are always involved a huge financial burden up-front and more speed on Return-on-Investment of a project. Based on information gained, strategies to strengthen and promotes broader adoption of sustainability in IBS construction, in Malaysia was suggested

Keywords: Industrialised Building System (IBS); sustainability; attributes

eISSN 2398-4295 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. 

http://dx.doi.org/10.21834/ajbes.v3i11.102

References

Abdullah, M.R. & Egbu, C. (2009). IBS in Malaysia: Issues for research in a changing financial and property market. BuHu 9th International Postgraduate Research Conference. (pp15-25). Salford, United Kingdom

Alridge, G., Pasquire, C., Gibb, A. & Blismas, N. G. (2002). Innovation through standardization nd pre-assembly:issues for benefit measurement. 10th Sysmposium Construction Innovation and Global Competitiveness. CRC Press.

Bari, N., Yusuff, R., Ismail, N. & Jaapar, A. (2011). Factors influencing the construction cost of industriaied building system projects. Proceedia of Social and Behavioral Sciences, 35, 689-696

Blismas, N., Pasquire, C. & Gibb, A. (2006). Benefit evaluation for off-site production in construction. Journal f Construction Management and Economics, 24(2), 121-130.

Chen, Y., Okudan, G. E. & Riley, D. R. (2010). Sustainable performance criteria for construction method selection in concrete buildings. Journal of Automation in Construction, 19(2), 235-244

Construction Industry Development Board (2003). Industrialised Building System (IBS) Roadmap 2003-2010 . Kuala Lumpur: CIDB Malaysia.

Ding, D. (2008). Sustainable construction- the role of environmental assessment tools. Journal of Environmentl Management, 86(3), 451

Encyclopedia of Earth (2007). Sustainomics and sustainable development. Retrieve from http://eoearth.org.

Goodier, C. & Gibb, A. (2007). Future opportunites for offsite in the UK. Journal of Construction and Engineering Management, 25(6), 585-548.

Jaillon, L. & Poon, C.S. (2008). Sustainable construction aspects of using prefabrication in dense urban environment. Journal of Construction Management and Economics, 26(9), 953-966.

Kibert, C. J. (2007). The next generation of sustainable construction. Journal of Building Research & Information, 35(6), 595-601.

Kamar, K. A., Hamid, Z., Ghani, M.K., Charles, E. & Arif, M. (2010). Collaborative initiative on green construction nd sustainability through industrialised buildings system (IBS) in the Malaysian construction industry. International Journal of Sustainable Construction Engineering & Technology, 1(1), 119-126.

Kamar, K. A., Hamid Z., Azman, M. N.A. & Ahamad, M.S. (2011). Industrialised building system (IBS): revisiting issuesof definition and classification. Journal of Emerging Science ,192, 120-132

Mohamad, I.M., Zawawi, M. & Nekooie, M.A. (2009). Implementing industrialized building system (IBS) in Malaysia: Acceptance and awareness level, problems and strategies. Malaysian Journal of Civil Engineering, 21(2), 219-234.

Nornes, D. (2005). Life cycle cost analysis (lcc) in the united states green building industry. Master of Science Thesis Colorado State University, USA.

Pallant, J. (2010). SPSS survival manual. (4th ed.). Berkshire:McGraw-Hill, (Chapter 11).

Richard, R.B. (2006). Industrialised, flexible and demountable building system: quality, economy and sustainability. International Research Symposium on Advancement of Construction Management and Real Estate. Beijing, China.

Robichaud, L. B. & Anantatmula V. S. (2010). Greening project management practices for sustainable construction. Journal of Management in Engineering, 21(7), 48-57.

Shaari, S. N. & Ismail, E. (2003). Promoting the usage of industrialised building system (IBS) an modular coordination (MC). In The Malaysian Construction Industry. Bulletin Ingenieur, pp 7-9.

Shen, L.Y., Hao, J.L., Tam, Y. & Hao, Y. (2007). A checklist for assessing sustainability performance of construction projects. Journal of civil Engineering and Management, 14(4), 273-281.

Thanoon, W.A.M., Peng, L.W., Kadir, M.R.A., Jaafar, M. S. & Salit, M. S. (2003). The Experiences of Malaysia and Other Countries in Industrialized building system. Proceeding of International Conference Industrialized building systems, Kuala Lumpur, Malaysia.

Yang, J.(2010). Critical success factors for stakeholder management: Construction practitioners’ perspective. Journal of Construction Engineering and Management, 136(7), 778-786.

Yee, A.A. (2001). Social an environment benefits of precast concrete technology. PCI Journal, 5-6, 14-20.

Yang, J., Brandon, P.S. & Sidewell, A.C. (2005). Introduction-Bridging the gaps in smart and sustainable built environment. Blackwell Publishing Ltd.

Yunus, R. & Yang, J. (2011). Sustainabilifor Industrialised Building System (IBS) in Malaysia. Procedia Engineering, 14, 1590-1598.

Tam, C.M. (2002). Impact on structure of labour market resulting from large-scale implementation of prefabrication. Journal of Advances in Building Technology, 399-403.

Downloads

Published

2018-05-20

How to Cite

Shamsuddin, S. M., Zakaria, R., & Mohamed, S. F. (2018). Economic Attributes related to Industrialised Building System in Malaysia. Asian Journal of Behavioural Studies, 3(11), 65–73. https://doi.org/10.21834/ajbes.v3i11.102

Issue

Section

Articles