Applied Mathematical Model for Construction Planning in a Housing Development Project

Grit Ngowtanasuwan

Abstract


The paper presented a method for solving a construction planning problem in a housing development project using a mathematical model which is an integer linear programming for dividing house construction jobs to three contractors in a project case study. 169 units of the houses in the project would be constructed by the three contractors in two methods, conventional construction method and precast method. The results found a minimum construction cost of the project was 417.69 million baht (M$13.92), and within the total project duration of 72 months. Conclusions and recommendations were discussed in this article.

Keywords: Housing Development Project, Mathematical Model, Precast Concrete Construction.

eISSN 2398-4295 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. 

DOI: http://dx.doi.org/10.21834/ajbes.v3i13.140




Keywords


Housing Development Project, Mathematical Model, Precast Concrete Construction.

Full Text:

PDF

References


Connie Susilawati, Desire L. Litaay, and Andre Parsaulian (2001). Application of Linear Programming for Dormitory Development Plan at Petra Christian University, “DimensiTeknikSipil” volume 3 number 2 September 2001 p.59–63.

Fatma A. Agrama. (2012). Multi-objective generic optimization of linear construction projects, “Housing and Building National Research Center” Elsevier.

Frederick S. Merritt and Jonathan T. Ricketts (2001). “Building design and construction handbook” Sixth Edition. McGraw-Hill Companies, Inc. New York.

Grit Ngowtanasuwan (2013). Mathematical Model for Optimization of Construction Contracting in Housing Development Project. “Procedia Social and Behavioral Sciences”, AicE-Bs 2013 London, ScienceDirect, Elsevier Ltd.

Haas A. M. (1983). “Precast Concrete: Design and Applications”. Essex. Applied Science Publishers Ltd.

Hillier S. Frederick and Lieberman J. Gerald (1990). “Introduction to Operations Research”, 5th ed. McGraw-Hill Book Co. Singapore. p466.

Kim S. Elliott (2002). “Precast Concrete Structures”, 1st published. Oxford. Butterworth-Heinemann Publications.

PCI. (1973). “Architectural Precast Concrete”, 1st ed. Prestressed Concrete Institute (PCI).

Ryan E. Smith (2010). “Prefab Architecture a Guide to Modular Design and Construction”. John Wiley & Sons, Inc., Hoboken, New Jersey.

Taha A. Hamdy. (1997). “Operations Research an Introduction”. New Jersey. Prentice-Hall International, Inc. p367.

Wiki (2013). “Wiki - Based Encyclopedia”. Available at: http://en.wikipedia.org/wiki/housing development




DOI: http://dx.doi.org/10.21834/ajbes.v3i13.140

Refbacks

  • There are currently no refbacks.